Increase in channel habitat heterogeneity, remove barrier, remove hard engineering and re-meander/re-profile
River Restoration Opportunity
Brent River Park
River: Dollis Brook and Upper Brent
Catchment: Brent
Project length (km): 0.6
Project lead: London Borough of Barnet
Project status: Underdeveloped opportunity
Project driver
Amenity (place making) and nature/biodiversityRestoration Type
Habitat enhancementRestoration details
Project description
Interest in developing plan to restore the river and decoy ponds in Brent River Park, Barnet. The channel is overwide and shaded. There is a weir which could be removed and some artificial banks which could be replaced with bioengineering.Feedback
Have a question or a comment? Please contact us