Increase in channel habitat heterogeneity
River Restoration Opportunity
Beresford Avenue to A40
River: Lower Brent
Catchment: Brent
Project length (km): 2.5
Project lead: Clean up the River Brent, LAGER Can and London Borough of Ealing
Project status: Underdeveloped opportunity
Project driver
Nature/biodiversity and water qualityRestoration Type
Habitat enhancementRestoration details
Project description
In this section the river is constrained in a concreate channel, the stretch would be broken into reaches. The initial reach would be at the downstream end between the railway and the A40 (0.35km). Options include adding artificial riffles, floating reedbeds, bioengineering, mussel beds and a rubbish trap. Funding has been sought for a feasibility study .Feedback
Have a question or a comment? Please contact us