Create riparian zone, increase in channel habitat heterogeneity, remove barrier, remove hard engineering, re-meander/re-profile, two-stage channel and reconnect to flood plain
River Restoration Opportunity
Longford
River: Longford
Catchment: Crane
Project length (km): 0.4
Project lead: London Borough of Hounslow
Project status: Underdeveloped opportunity
Project driver
Amenity (place making), flood reduction, nature/biodiversity and water qualityRestoration Type
Daylighting and de-culvertingRestoration details
Project description
This amazing opportunity to daylight 400m of the Longford river sites within LB Hounslows Nature Recovery Plan and CVPs project list.Feedback
Have a question or a comment? Please contact us