Planning Policy

National

The National Planning Policy Framework sets out the Government’s planning policies for England and how it expects these to be applied.  It provides a framework for the development of more localised plans, which must be used to determine applications for planning permission (unless exceptions apply).

Having access to the right information for plan-making is implicit in the NPPF (Policy PM8(1): ‘…The preparation of plans should then be shaped and underpinned by information and data that is: …drawn from suitable and reliable sources that are sufficiently up-to-date.’). For decision making the NPPF (DM2(1)) requires local validation lists to set out the information requirements in support of an application including for national decision-making policies such as the ones for conserving and enhancing the natural environment (see details below). Each London borough, as a responsible authority, is required to ensure that the risks of impacts on biodiversity are adequately considered when delivering development. In addition to the requirements of the planning system, there are also legislative requirements and duties to meet (e.g. Environment Act 2021, Wildlife and Countryside Act 1981 as amended and the Natural Environment and Rural Communities Act 2006, Conservation of Habitats and Species Regulations 2010 as amended). It is essential that the statutory requirements are addressed on all developments to avoid the risk of legal challenge. A robust evidence base is required in order to adequately assess the impacts on biodiversity.

Rosemary beetle © Penny Metal

NPPF, Chapter 19 (extracts)

N2: Improving the natural environment

1. To contribute positively to the natural environment, and support nature’s recovery, development proposals should:

a. Consider the environmental qualities of land proposed for development, including habitats, landscape character and the natural beauty of the countryside, and identify opportunities for those qualities to be conserved or enhanced (including through requirements for biodiversity net gain where these apply);

c. Take suitable opportunities to connect to and strengthen ecological networks that extend beyond the site, drawing on the measures proposed by Local Nature Recovery Strategies, National Forest Strategies and Community Forest Plans, where present, and other relevant assessments;

d. Conserve and enhance existing natural features of visual, historic or nature conservation value (such as established trees and hedgerows) where possible; and use appropriate landscaping to help create a well-designed place and integrate the development into its surroundings;
e. Use green infrastructure provided as part of the scheme and nature-based solutions to secure multiple benefits: such as for biodiversity; surface water and pollution management (including maintaining flow rates and water quality); climate change mitigation and adaptation, and recreation;

f. Minimise any adverse impacts on biodiversity and include features which support priority or threatened species such as swifts, bats and hedgehogs. Development proposals should incorporate integrated nest boxes (commonly known as swift bricks) into their construction unless there are compelling technical reasons which prevent their use, or would make them ineffective; and

g. Ensure that green infrastructure and other features to support nature are located and designed to minimise risk of future failure, and that appropriate measures are in place for any necessary long-term management.

2. If significant harm to biodiversity resulting from a development cannot be avoided (through locating on an alternative site with less harmful impacts), adequately mitigated or, as a last resort, compensated for, then the development should be refused.

Other important policies include (not exhaustive):

N1: Identifying environmental opportunities and safeguards.

N6: Areas of particular importance for biodiversity and geodiversity.

Various guidance documents are also available regarding the consideration of biodiversity and green infrastructure in the UK – some of these documents are listed below and include references to local records centres.

More resources related to biodiversity and the planning process can be found here.

Regional

London has a three tier system of government.  The Greater London Authority is made up of the Mayor and the London Assembly.  One of the main roles of the GLA is to take a strategic role in London’s planning.  The Mayor’s London Plan sets out London’s framework for development for local plans to fit to.  The Mayor considers planning proposals of strategic importance.

Local

There are 35 local planning authorities in Greater London, including 32 boroughs, the City of London and the two Mayoral Development Corporations (London Legacy Development Corporation and Old Oak and Park Royal Development Corporation).  The local planning authorities lead on planning within their area.  This involves decision taking on planning applications and the development of:

  • Local Development Frameworks, including provision of locally designated sites – SINCs, LIGs, RIGs, LNRs
  • Local Biodiversity Action Plans
  • Open Space Strategies

GiGL use local planning documents for many purposes, such as in designated sites data validation and verification process. We have collected these, as well as local planning authority contact details and associated websites in one place, please see the Planning Documents page to access these.