Increase in channel habitat heterogeneity
River Restoration Opportunity
Re-wet riparian zone
River: Beverley Brook
Catchment: Beverley Brook
Project length (km): 0.1
Project lead: SERT/LB Merton
Project status: Underdeveloped opportunity and Engagement with LB Merton and Enable
Project driver
Flood reduction, nature/biodiversity and water qualityRestoration Type
Habitat enhancement and natural flood management (pond maintenance)Restoration details
Project description
Maintain existing floodwash ponds and add ephemeral ponds to keep soil permeable and able to receive floodwater. Rewet riparian zone. Opportunity for local engagement and low costFeedback
Have a question or a comment? Please contact us