Create riparian zone, increase in channel habitat heterogeneity, remove hard engineering and re-meander/re-profile
River Restoration Opportunity
Tokyngton Park Flood Alleviation Scheme (Phase 2)
River: Lower Brent
Catchment: Brent
Project length (km): 0.8
Project status: Concept design
Project driver
Amenity (place making), flood reduction and nature/biodiversityRestoration Type
Habitat enhancementRestoration details
Project description
In 2003, river restoration transformed half of the R Brent at Tokyngton Park. Options for Phase 2 for further river improvements plus flood alleviation that could combine new storage areas with new aquatic habitat along an 800m stretch that is currently a concrete channel.Feedback
Have a question or a comment? Please contact us